Infographic: The Adaptive Reuse Process at a Glance
Adaptive reuse means giving an old building a new use while keeping what makes it significant. Projects vary, but most follow a similar path. This infographic shows six stages as a captioned figure and then sets out the same information as plain text.
The figure
- Survey
- Significance
- Design
- Review
- Build
- Use and care
Full text alternative
1. Survey
Before anything is decided, someone records what is there: measured drawings, photographs, condition notes and a look at old maps and records. A historic structure report is the formal version. The survey answers basic questions: what is original, what was added, what is failing.
2. Significance
Next comes a judgement of what matters. The National Register of Historic Places criteria ask whether a property is linked to important events, people, design or information. For an industrial building, significance may sit in its process layout, its structure or its landmark presence, not only in its decoration. Defining the character-defining features early protects them later.
3. Design
Architects then fit the new use to the building rather than the other way round. Good schemes put heavy or highly serviced uses where the structure already suits them, keep large volumes open where possible, and make new work distinguishable from old. The Secretary of the Interior's Standards for Rehabilitation are the common reference.
4. Review
Many projects need approval. In San Antonio, work on designated landmarks and in historic districts goes before the city's Historic and Design Review Commission. Projects seeking the federal historic tax credit are reviewed by the state historic preservation office, in Texas the Texas Historical Commission, and by the National Park Service. Review often sends the design back a step, which is the loop in the figure.
5. Build
Construction on old buildings brings surprises: hidden damage, buried openings, unexpected materials. Careful projects keep a record of what was found and removed.
6. Use and care
The building finally goes back into use. Maintenance plans for roofs, gutters, mortar and windows decide whether the rehabilitation lasts decades or needs redoing soon.
Reading a real project against the figure
Large brewery conversions, such as the former Lone Star Brewery buildings that became the San Antonio Museum of Art, or the later mixed-use redevelopment of the former Pearl Brewery from the early 2000s, can be read against these six stages using public reporting and review records. See also the gravity brewhouse infographic.
Sources
- National Park Service, Secretary of the Interior's Standards for the Treatment of Historic Properties.
- National Park Service, National Register Bulletin 15, on applying the National Register criteria.
- Texas Historical Commission; City of San Antonio Office of Historic Preservation.